Action Plan
Catalogue of energy-saving actions with before/after measurement on selected sensors.
The Action Plan page lives under Optimisations. It is a catalogue of improvements you put in place on site: a title, an estimated gain, the sensors concerned, and the go-live date. The dashboard then measures the real consumption change on those sensors.
What an action captures
| Field | Purpose |
|---|---|
| Title | Short name you will recognise in the catalogue |
| Estimated gain (%) | The reduction you expect on the selected sensors |
| Go-live date | The day the change was (or will be) applied |
| Comparison window | How many complete days to compare on each side of that date (7, 14, 28 or 90) |
| Sensors | One sensor or a set — rooftop HVAC, a cold room, lighting, etc. |
| Status | Planned, active, or archived |
How measured gain is calculated
For each action the page takes the same number of complete calendar days immediately before go-live and immediately after it, in the site timezone.
measured gain % = (kWh before − kWh after) / kWh before- Incomplete days (including today) are excluded so the two sides stay comparable.
- While the after-period is still filling in, the action is marked Collecting data and the percentage is a partial reading.
- A future go-live date stays Planned until that day arrives.
- The daily bar chart is centred on go-live (
D0): grey bars are before, green bars are after.
Catalogue totals
The headline Measured gain is not a plain average of the percentages. Each action is weighted by its baseline kWh, so a 5% saving on a large asset counts more than a 30% saving on a small one. Estimated gain uses the same weighting.
If two actions share sensors, a warning appears: those kilowatt-hours can be counted twice in the total.
Archived actions stay in the catalogue for history but drop out of the totals.
When to use it
| Goal | How |
|---|---|
| Record a real operational change | Create an action the day you change a setpoint, schedule, or piece of equipment |
| Check whether the change delivered | Wait until the after-window fills, then compare estimated vs measured |
| Keep a living ISO 50001-style register | The catalogue is the list of implemented improvements and their verified gain |